top of page
NN Fabrications Ltd
This project involved reducing the overall height of a large steel-framed roadside sign. The original structure was carefully cut down by shortening the vertical supports, then fully re-welded and reinforced to maintain strength and compliance. Gap filler bars were fabricated and welded in place to close open sections left by the modification, ensuring a clean finish and restored structural integrity. All work was completed on-site with precision and safety in mind, delivering a durable, professional result.
Steel Sign Frame Modification




bottom of page